CANADIAN POLICY ANALYSIS
Canada’s Nuclear Energy Program
Canada runs a mature and unusual nuclear program: a domestically developed reactor line (CANDU), a major share of world uranium supply, and a historic leadership position in medical isotopes. It began in wartime collaboration and pivoted early and deliberately to peaceful applications.
Nuclear supplies roughly 13–15% of national electricity — but that number conceals the real dependency. In Ontario it is around 50–60%, and in New Brunswick roughly 30–40%. It is a cornerstone of non-emitting supply in the provinces that use it.
Who does what
| Body | Type | Role |
|---|---|---|
| CNSC | Independent regulator | Licensing and safety oversight of all nuclear activity |
| NRCan | Federal department | Nuclear energy policy |
| AECL | Crown corporation | Manages federal nuclear liabilities |
| CNL | Contractor (GoCo) | Operates the national laboratories |
| NWMO | Waste organization | Long-term used-fuel disposal |
| OPG / Bruce Power | Utilities | Operate the reactor fleet |
Cameco supplies fuel; AtkinsRéalis (Candu Energy) stewards the reactor technology. The separation of regulator from promoter is the structurally important feature here — CNSC licenses, NRCan advocates, and the two are not the same office.
The fleet, and the refurbishment wave
The operating fleet is concentrated in Ontario: Bruce A and B (~3,437 and ~3,507 MWe), Darlington (~3,512 MWe), and Pickering B (~2,160 MWe). Most of it was grid-connected between 1977 and 1993, which is why the defining operational activity of this decade is refurbishment — mid-life overhauls that extend reactor life by decades. Darlington units have been refurbished and returned; Bruce units are progressing; Pickering B runs to end-2026 with refurbishment planned.
These projects are the practical test of the program. They are large, long, and historically the kind of work where nuclear schedules and budgets go wrong.
Waste — the unresolved century
The NWMO selected a site in the Wabigoon Lake Ojibway Nation / Ignace area of Ontario in November 2024 for a deep geological repository for used fuel, and is entering regulatory review. That is genuine progress on a file that has been open for decades — and it is worth noting what happened to the alternative: OPG’s proposed low- and intermediate-level repository at the Bruce site was withdrawn in 2020 after the Saugeen Ojibway Nation voted against it. Consent is not a procedural step in this file; it is the constraint.
Separately, CNSC has approved construction of a near-surface disposal facility for low-level waste at Chalk River.
Assessment
Canada’s nuclear position is strong on fundamentals — indigenous technology, fuel supply, regulatory independence, and a fleet being extended rather than retired. The open questions are execution questions: whether refurbishments land on schedule, whether the repository survives regulatory and community review, and whether small modular reactors move from proposal to operating plant. None of those is settled by the strength of the starting position.
Sources
- Canadian Nuclear Safety Commission — licensing and fleet status
- Nuclear Waste Management Organization — site selection, November 2024
- Natural Resources Canada — nuclear energy policy
- OPG and Bruce Power refurbishment program reporting
Method note: condensed from a longer research report. Capacity figures are net MWe and approximate; fleet status changes as refurbishment units return to service.